News

News »
Recently, we upgraded the existing controls in the control room of JBS Beef City Feedlot in Toowoomba, modernising the MCC panel and relocating it to a new switch room. Additionally, motor starters were enhanced with new motor control devices, including VSDs and Allen Bradley electronic overloads (E300s) for DOL motors. Read more in this article.
News »
I2R teamed up with a local Industrial Electrical Contractor to revamp the main switchboard, paving the way for the newest Medical Imaging Machines to find a home at Griffith's "Your Health" Medical Premises.
News »
Discover how I2R tackled JBS abattoir's challenge head-on by upgrading their outdated MCC controlling cryovac vacuum pumps.
News »
I2R successfully updated the Main Switch Board at Griffith Central despite tight schedules and operational constraints. Our solution involved merging the meter points for IGA (Fresh Mercato) and the rest of the plaza, which streamlined energy monitoring. As a result, the end-client enjoyed reduced energy expenses and a significantly lower power bill.
News »
I2R conducted a comprehensive audit report including all the necessary information for the client to make an informed decision on upgrading their network and automation infrastructure.
News »
The Rockwell Automation Fair in Boston stands as the biggest global event in industrial automation and digital transformation. This year we were given the opportunity to attend the four-day conference. Discover the highlights of our trip.