Ongoing Project
Client's Challenge: Aging Electrical Infrastructure.
JBS Riverina identified the aged equipment and infrastructure to be a risk for their operation. They contacted I2R Group for a comprehensive upgrade to the electrical and control of there Render Plant including the construction of a complete new switchroom.
I2R Solution: Comprehensive Upgrades To All Areas
This project began with a pre engineering design phase that involved mapping out all areas of the project, including the switch room, switchboards, automation, electrical, and civil construction. The documentation, drawings and specifications were used to determine the best possible custom design for JBS. What sets I2R apart from other automation companies is our ability to manage the entire process, from the initial conceptual design to the commissioning and handover stages.
Before and After
Project Overview
New Electrical Switch Room Design and Construction:
- Structural design and certification.
- Collaboration with a fire engineer for certification.
- Construction management and execution.
- Automation hardware supply, installation, and programming.
- Electrical design, distribution, and commissioning.
- Manufacture and installation of MCC and remote panels.
Switchboard Supply and Manufacture:
- Main switchboard (MSB) for rendering plant.
- Power and lighting distribution panels.
- New rendering MCC panel.
- Static Var Panel
Onsite Electrical Installation and Commissioning:
- Multi stage changeover from old to new infrastructure with no down time
- Removal of existing switchboards and remedial works.
- Commissioning of new automation and control architecture, ignition SCADA deployment
I2R's Capabilities
This case study illustrates I2R Group’s commitment to meticulous project management and delivering seamless upgrades to customers, focusing on safety, compliance, and operational efficiency.
New Automation Architecture