News

News »
I2R's team designed and manufactured Prefabricated Switchrooms to ensure continuous operation of a plants processing factory.
I2R Turnkey Solutions - MCC Upgrade to Leeton-Sewer-Treatment-Plant
I2R designed, manufactured and comissioned the main switchboard and Motor Control Centre (MCC) upgrade for the Leeton Sewer Treatment Plant to maintain compliance with current standards.
News »
Recently, we upgraded the existing controls in the control room of JBS Beef City Feedlot in Toowoomba, modernising the MCC panel and relocating it to a new switch room. Additionally, motor starters were enhanced with new motor control devices, including VSDs and Allen Bradley electronic overloads (E300s) for DOL motors. Read more in this article.
News »
I2R teamed up with a local Industrial Electrical Contractor to revamp the main switchboard, paving the way for the newest Medical Imaging Machines to find a home at Griffith's "Your Health" Medical Premises.
News »
Discover how I2R tackled JBS abattoir's challenge head-on by upgrading their outdated MCC controlling cryovac vacuum pumps.
News »
I2R successfully updated the Main Switch Board at Griffith Central despite tight schedules and operational constraints. Our solution involved merging the meter points for IGA (Fresh Mercato) and the rest of the plaza, which streamlined energy monitoring. As a result, the end-client enjoyed reduced energy expenses and a significantly lower power bill.